what is cogging and crawling

Answer Posted / heramb mayadeo

when an induction motor refuses to start even if full
voltage is applied to it, this is called as cogging. this
happens when the rotor slots and stator slots are same in
number or they are integer multiples of each other. due to
this the opposite poles of stator and rotor ome in front of
each other and get loked.
on the other hand when an IM runs at a very low apeed
(precisely speaking 1/7th of synchronous speed)even if full
rated voltage is applied to it,then it is called at
crawling. this happens due to harmonic induction torques.
in which torques due to 7th harmonic overpower the driving
torque(fundamental component torque).

Is This Answer Correct ?    336 Yes 18 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What willbe change in programming when we use 5/3 solenoid inplace of 5/2 in operating of a cylinder?

1610


What are the Full Forms of TVM, MTL, CVT ?

914


I NEED RRB APTITUDE QUESTIONS AND MODEL PAPER,PLEASE SEND MY E-MAIL joo28_eee@yahoo.co.in

1452


What happened if C.T mount at any cable or Bus bar in wrong direction . C.T going on proper work or not . C,T direction is essential thing to properly work.

1245


what is p.s impedance measurement test in earthing transformer?

1844






how calculate gd2 of ht motors

1827


What is the universal motor?

644


sir, what is the importance of Fault MVA. how to calculate fault mva of 33kv substation connected by 6.5 km line(single circuit with equal spacing) with 110/11kv transformer in 110kv susbstation.the fault mva on 11 kv bus in 110kv susbstation is 208mva.

2484


ROC converges if poles and zeros lie inside a. Origion b. Z=1

1785


why ht cable end termination don't have a gland?

2288


What is stepper motor?

721


what is the use of expulsition protective gap in 11Kv line.

1684


briefly explain the main blocks found in a microprocessor based system

1715


Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT

2121


how we calculate the short circuit capacity of the busbar in LV & HT?

642