Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Expain about V model?

Answer Posted / balaji naidu. y

In this model u have checked the verfication and
validation. In the left side phase we can called as
verfication and the right side phase we can called as
validation. The left side phase consists of

1. BRS(Buisiness Requirement specification).
2. SRC(System Requirement Specification).
3. HLD(High Level Designing).
4. LLD(Low Level Designing).

once if all the stages are completed then a build is formed
nothing but before going to construct a building a building
plan is compulsory like that before going to test we must
build.

in the build process also called verification in this
process SQA (senior quality assurance) will involves to
make sure that the each and every process is going correct
or not.

in the center we have source code this must be developed by
developers(programmers).

on the right side we have the following things.

1. UAT (User Acceptancy Testing)
2. FT (Functionality Teting)
3. IT (Integration Testing)
4. MT (Module Testing).

during the build process testing team going to prepare test
cases

UATCD (User Acceptancy Test Case Design)
STCD (System Test Case Design)
ITCD (Integration Test Case Design)
MTCD (Module Test Case Design).

once these test cases are prepared then the testing
involving the testing like once the plan is ready we are
going to construct the building like that once the test
case design is over then it will be sent to testing team to
test occordingly if they found any "bugs" (nothing but
errors) immediately report to developers (programmers) test
engineer only fix the bugs but developers rectify that bugs
again this will sent to the testing team and the process is
going on to all the modules.

This model is only follows MNC's because this model needs a
lot of man power

advantage of this model is

1. High Quality (due to Verification and Validation).
2. Within time delivery.
3. Reduce the cost of project.

Thank you guys

This is
Balaji Naidu. Y
Test Engineer

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

can any one explain me briefly erp pharma project including all modules,like how to tell this project in interview in terms of s/w testing

2122


When new application ready to test than whats your testing strategies?

1715


Do we have any certifications for ETL Testing ?

2237


Tell me the advantage and disadvantage of cookies?

1361


What are differences in testing a client server and a web application?

2090


1.What is configuration Management? 2. Explain Impact Analysis 3. Explain Peer Review 4. what i kickoff phase of Formal Review. 5. Whatv are the phases of fundamental test process. 6. what is state transition testing. 7. what is LCSAJ 8. Test conditions are derived from where?

2013


What are the possible test scenarios around AVS check of any credit card? (Testing through payment gateway online) (What are the fields we should check while checking AVS and CVV)

1584


10 scenarios for security testing using gmail applications?

8550


how to test a web application manually?can u explain indetail?

2080


What is the test harness?

1107


what is the difference between test case and result matrix

2199


how will you test transfer funds module...explain in detail

1621


Can anybody give whole test cases for banking module.it should include from start to end .that will help me more.to do study.it should contain account,deposite,withdraw,fd,atm modules.?please try to give me??

2313


How do you test google or gmail application??tell me step by step process??

11309


What is rapid application development model (rad)?

1334