How to defind P.C.C. mix design according ratio & IS coad
Answer Posted / pulak majumdar
Actually for M25 & above grade mix desigm done for RCC work.
Mix design not follow ratio.I think mix design not done for
PCC work.
| Is This Answer Correct ? | 15 Yes | 31 No |
Post New Answer View All Answers
What is the difference between one-way slab and two-way slab?
importance of the soundness test to determine the quality of cement use for any construction
Define What are the reasons for geotechnical site investigations in Uganda?
what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon
how to shuttering is used in slab
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
which type of instrument included in plumbing work?name of instrument?
Why steel rods are produced only in even dimensions?
what is the weight of 6000 psi concrete in lb/cft?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
in block masonry l=10',b=0.5',H=10',Calculate cement ,sand and no.Of blocks?
can stub column take the load as main column
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Which percentage of carpet area use in plot area of office building.
How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?