hi i am chemical engg. 4 year student i am not placed till
year what will i do for my batter futere
Answer Posted / sada
hi.....i am also a chemical eng....working in reliance
petrochemical groups.... upto me ....if u want a job go
through o.p guptha and general aptitude books and attend
all the entrance exams.....u will....gwt a job.......
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
What are some good uses of low-grade steam at 12 atm and 1920c?
I am a Diploma Chemical Engineer by Nirma Uni; and BEng (Hons) Energy & Environmental Engineer by Napier Uni; Edinburg, UK. HPCL chemical engineering test will held on 14th July,09. So, Please send me some previous chemical engineering papers Objective types Or material to give the test.
What are some common causes of control valve noise?
What are some characteristics of bulk solids that can affect their ability to flow properly?
marketing procedure of iocl
What could be a possible cause for sudden foaming in a cooling tower?
What are pcbs?
could any one plzz give me the placement tech papers taken by iocl,and bpcl in chemical stream..... my id is.... mishra.gaurang@gmail.com
What is the order of a chemical reaction, , if the rate of formation of 'C', increases by a factor of 2.82 on doubling the concentration of 'A' and increases by a factor of 9 on trebling the concentration of 'B'?
For amonia manufacturing process if pressure, temperature would be increase over optimum level what would be happen?And what steps should be taken?
whats the allowed tolerance of pipe to pipe butt joint mismatching
i have done B.TECH in che.tech.and doing MBA . why you doing mba why u have not join any job.
testing formula for oxygen by ammonium chloride,ammonium hydroxide and copper
What is the best way to handle bend or turns in slurry piping systems?
MY generator water cooler inlet line height - 11 mtr inlet water line height - 7 mtr water come into the line from overhead tank, O/H tank height - 20 mtr the first tapping in the inlet line is 2" line which down to 4 mtr level plateform., second tapping in inlet water line goes to a pump 6" line installed at 4 mtr level plateform, pump capacity 200m3/hr, head- 30 mtr, hp-40. the outlet of pump of 6" water line connected to a header of 6 mtr long of 6" line, on this header the six tapping are connected, 4 nos. 3" line goes to 11 mtr height water cooler the pressure of the line is 0.15 to 0.25 kg/cm2, 2" and 4" pipe line connected to a cooler at 4 mtrlevel plateform. my question is, at 11 mtr height level the quantity of water and flow is not sufficient for my cooler, the temp. of cooler is rises much more. you are requested to suggest the modification of pipe line/ pump for take more water flow and pressure (desired pressure is 1 kg/cm2)