in base representation for a rupee 100 paise,then base 8
representation what is rupee value .
Answer Posted / selvan
base representation for a rupee is 100 paise
then base 8 means 8*100p=800p
that is 8 rupee
| Is This Answer Correct ? | 4 Yes | 5 No |
Post New Answer View All Answers
Find the least value of 3x + 4y if x2y3 = 6.
From a vessel on the first day, 1/3rd of the liquid evaporates. On the second day 3/4th of the remaining liquid evaporates. what fraction of the volume is present at the end of the II day.
7 students can complete a task of making 9 scientific models in 21 days. How many students can make 3 models in 14 days.
What are all the java technical questions?
An equilateral triangle of sides 3 inch each is given. How many equilateral triangles of side 1 inch can be formed from it?
JSW steel online test questions
What is the attitude
2020201-565656=?
A clock showing 6 o'clock takes 30 secs to strike 6 times.How long will it take to strike 12 at midnight?
George while driving along the highway saw road markers which are at equal distances from each other. He crosses the markers every 20 seconds. If he increases his speed by x meters per second, he crosses the markers at every 15 seconds. But if he increases his speed by y meters per second, he crosses the marker at every 10th second. If y-x = 40 meters per second, then what is the distance between two markers.
A garrison of 3300 men has provisions for 32 days, when given at a rate of 850 grams per head. At the end of 7 days reinforcement arrives and it was found that now the provisions will last 8 days less, when given at the rate of 825 grams per head. How, many more men can it feed?
f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, Value of f(16)+f(15)-480
2 oranges,3 bananas and 4 apples cost Rs.15 . 3 ornages 2 bananas 1 apple costs Rs 10. what is the cost of 3 oranges, 3 bananas and 3 apples
How many mashes are there in a sq. m of wire gauge. Each mesh being 8mm long X 5mm width
A finishes the work in 10 days & B in 8 days individually. If A works for only 6 days then how many days should B work to complete A's work?