Answer Posted / djchauhan
0.3
| Is This Answer Correct ? | 9 Yes | 1 No |
Post New Answer View All Answers
What is rolling stock
What are the advantages of building a dam on the river nile?
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
PL.tell me about civil engineering questions with answer
What is the tensile strength of marble?
how to find hardness of water?why it should be determined?
A rock anchor 3 1/2” in diameter is placed in rock. The which has an allowable shear strength of 1200 psi. Determine the required anchorage length to safely carry a 80 ton load using a 2.0:1 F.S
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
What are the different types of civil engineering?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
how to find quantity of concrete in PCC M15
questions with answers to face an interview of an civil engineer regarding RCC buidings
What do you mean by tolerance factor of concrete ?
Explain the term 'Gross unit rate' and identify the items that may be included in the gross unit rate.