how to connect the hyperlink in webi reports?
Answer Posted / simha
u create a new Hyperlink, open the webi& go for new tab,
select Hyperlink opition.
Hyperlink window will appear, in this window give name,
Mainly u select URL path i think this is soruce location.
this source location will be transfered into target
locations(select Folders or Categories).click ok
Then automatically Hyperlink will connected.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
Explain how can we do load testing for webi reports? (Example if I have have to test one webi report for concurrent users refreshing report at one time)?
In banking domain how many Fact tables,Dimension table are present?
explain in detail about type 3?
What is package in BO
What is difference between webi and infoview?
Explain what three things do you consider to be the most important factors for a manager?
Difference between zabo and webi?
If I have three predefined prompts. In a report it will come randomly. How they will come in a specified format?
1. 101 vinay hyderabad 123 naresh usa 152 singh delhi 101 vinay usa 123 naresh mumbai 156 raju chennai From the above data we need to retrive current data in a report ? how and explain in detail ?
I have 2 doubts regarding the "Input Control" functionality in BI4: 1) Can the Input Controls in BI4 be manipulated? I mean, can we change the IC display as BOLD or change the values from Italics to regular? Or change the colors? 2) How to get hierarchy type control in IC? Let's say my first IC is for Country and second is for State. If I select a particulat country from Ist IC,second one should show me states belonging to selected country. Is that possible? Thanks in advance!!!
What are all the points to keep in consideration, while we are migrating the Universes,Reports from BO5.1.6 to BO 6.5? Is is compatible to migrate like this? Does it effect the filters in Reports and Join in the Universe?
Explain what task is 98% of the required work of a business analyst?
Explain about an assignment you worked on in which you had to amass a huge amount of data, and then analyze it?
Explain what sort of existing documents should business analysts refer to when starting on a new project?
Explain are data mart and dwh normalized or denormalized? Do both of them exist in the same tier?