Answer Posted / mukund
hi can some body make me little bit more clear abt the
entry and exit criteria.
1. Entry criteia means when we are going to start the
testing . , then what are the necessary steps we have to
take.
2.exit criteia To which point we are calling as exit
criteia , wheather we sucessfully completed the testing ,
like as mentioned in answer 1 or due to some irrecoverable
error we stopped the testing like as answered in 2 .
3. can we a write both the conditions in exit criteria
| Is This Answer Correct ? | 5 Yes | 3 No |
Post New Answer View All Answers
How is retesting different from regression testing?
What are test driver and test stub and why it is required?
In case you have any doubts regarding your project, how do you approach?
Explain what is test metric is software testing and what information does it contains?
What is basis set?
What the purpose of testing?
Case Study:-Given a standard calculator with the basic functionality of addition,substration,multiplication and division-write the test case to test this and tell how did it take to write the above test case and how ling would it take to execute them?
When do you think qa activities should start?
Why is automation testing preferred over manual testing?
Can manual testing be completely replaced by automation testing?
How u r estimating the budget 4 the project?
Could anyone share FAQs for QA/QC position.
Explain cmm?
can anybody tell me that from whr i download rational rose setup (free)?
Explain what is the rule of a "test driven development"?