I need to perform a 4hr test run in performance center 9.0
there i need to rampup 10 users after 1 hour. I selected
the run tab and added users to down state -> Ready state->
initialise-> Run state. 10 users ramped up successfully for
the next 1 iteration only after that the 10 users
automatically goes to the stop status. But i want the
ramped up users to be carried out for the next 3 hours.
Please help me out how to do the rampup successfully for
the remaining time period.

Answer Posted / rk

You have entervalues in Rampup and Rampdown and dudration
in Design Tab ...

Editschedule---in Design Tab ...

Thanks
RK

Is This Answer Correct ?    3 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is x-windows?

644


How is each step validated in the script?

637


What is remote command launcher?

638


What are the different sections of the script? In what sequence do these sections run?

761


What is loadrunner controller?

644






What is parameterization?

653


What do you mean by path?

644


Why we insert the rendezvous point while running the scenario?

597


During the load test, what is the optimum setting for logs?

596


What is the load runner testing process?

588


What the host attributes determine?

650


What are the element in the loadrunner controller?

615


What is the difference between hits/second and requests/second?

511


Where are automatic correlation options set?

589


What is host?

667