Answer Posted / jinu
the major difference in between sap r/3 and APO is that in
sap r/3 excecuting of production orders or purchase
orders,material withdrawal and costing takesplace,whereas
in apo only planning can be performed,
Sales orders are only created in SAP R/3 whereas in APO it
is not created.
IN APO planning is done for the critical materials using
MRP type X0.
| Is This Answer Correct ? | 20 Yes | 1 No |
Post New Answer View All Answers
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is Material status and which view of the material master it is available?
What is the standard info set?
Explain the lsmw and the steps involved in them.
What is the planning time fence?
What is recursive BOM
Can't one material be assigned to more than one operation in a routing?
what is std info set? where it is used?
What is internal payroll process?
What general data appears on basic data screen?
How to attach a drawing for a material to bom ? Is it possible ?
Can we have more than 6 standard values in standard value key?
What are the MRP master data?
Which MRP types you have used?
Steps to configure Production order type.