Answer Posted / jinu
the major difference in between sap r/3 and APO is that in
sap r/3 excecuting of production orders or purchase
orders,material withdrawal and costing takesplace,whereas
in apo only planning can be performed,
Sales orders are only created in SAP R/3 whereas in APO it
is not created.
IN APO planning is done for the critical materials using
MRP type X0.
| Is This Answer Correct ? | 20 Yes | 1 No |
Post New Answer View All Answers
What is the use of mrp group?
what are the settings needed for variant configuration?
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
One component we can assign to workcenter at routing
What is the standard info set?
What do you mean by basic dates
What is the recruitment cycle?
• How are basic order dates determined?
You want to integrate pp with fico. What steps would you take?
What are the t-codes for creating, changing and summarizing bom?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What is the need of mrp list if the stock requirement list is already given?
What are sequence, parallel, overlapping, splitting and where can we assign these
What are the production process in sap?
What are the MRP master data?