As an engineer, what u should do when the construction of a
building doesn't meet the required specifications?
Answer Posted / vpmohapatra
first of all i should look into the areas where the problem
has occured.Then i should look at all the calculations and
find the solution.
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
What are the advantages of cad software’s?
Describe the advantages and disadvantages of using plastic and timber fenders?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What is hybrid foundation?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
how to calculate MR 9(derivation)
How much material is required for constructing a 2 Lane 2Km rigid pavement road
What is the Unit weight of coarse sand (F.M- 2.20) ?????
How to construct a water sump in a rocky soil?
Formula for calculation volume of essentric footing
How is make concrete cube?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
what is total volume of ingredients used in concrete accordingly
difference between trapezoidal and pedestal footing and how the load acts on that
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation