Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

can we use HPSV LAMP in HPMV LAMP fixture ?and viseversa.

Answer Posted / dolnarayan patel

Yes , we can.

Is This Answer Correct ?    18 Yes 5 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company

2231


Define settling time.

1212


Swg formulae

2082


Zone of protection and tripping scheme of arc protection relay.

1929


Why we use ups battery and dsdb battery in thermal power plant

2148


in the directional overcurrent and earthfault protection,normally we are setting the angle 45 deg lead for phase fault overcurrent and -45 deg lead for earthfault fro forward direction.but both the fault are operating on the same angle region only.why?how the relay will response?

1884


What is the difference in calculating size of AC cables compared to calculating size of DC Cables? Usually DC Cables are larger than AC Cables although they have the same ampacity. Why is it?

2030


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2088


IF 8255 CONTROL WORD IS 94H,Tell the chip port work mode ?

2616


What is the permissable nutral current of three phase system as per IS standards?

2169


if you are in a software company,then why do you want to come in a core company like sail, ntpc(where lots of trouble like tension but you have a good life in a it company) ?

1964


HOW TO DESIGN THE body EARTH cable(Copper Conductor) size for 60KVA UPS?

2051


what's the exact magnitude of current, flows through Neutral?

2009


WHAT IS DIFFERENCE BETWEEN CAPACITOR AND CAPACITANCE?

2133


What is the alternate solution for testing of polarity by using polarity tester while its milli ammeter does not works?

2047