Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how can we represne the analog signal and digital signal if
want to measure the speed and we have to use PLC

Answer Posted / guest

You are right Hmt,but you are giving the digital signal only
read the question carefully

Digital Signal :- for this purpose use zero speed controller
to measure the 0-1400RPM.
in this controller there is one delay & one instant contact
The proximity switch sense 0-200RPM speed gives signal to
Controller ,controller gives the instant relay contact to
PLC as Digital signal as Motor is Runing if motor reach to
the statable speed with the time period the controller give
the delay contact to PLC as digital signal.

Analog Signal:- For the purpose use encoder inside the motor
shaft with give conitious pulse with every roation in the
form of (4-20mA & 0-10v)with respective to )-1400RPM or
whatever speed we configure to PLC as Analog Signal

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is Anemometer used to measure?

1117


What should be the height of basement according to NBCC code?

2198


Don't you have similar question banks related to Oral Certification Examination conducted by Mercantile Marine Departments / Directorate of Shipping, Ministry of Shipping for Electro Technical Officer?

1666


can a 150 kva 3 phase 440v/230V delta-wye step down transformer can be use as step up transfoermer with connected loads at 440v side?

1730


explain all the classes with example

1958


During Testing of Maintenance Free Earthing, How deep should be the Spikes of Earth Test Meter should be inserted in the soil(one spike is 15 Meter & Other spike is 30 Mtrs away from the Main Earth Electrode. Because, recently, we observed that when spike is inserted 3-4 Inch in the earth- results are better, If spike is inserted 1 feet deep than results are increasing.

1938


which pump used in STP

2208


How to calculate the heat load for a electrical room

3073


Benifits of 3ph 4 wire metering over 3ph 3 wire

2464


Compare jfet’s and mosfet’s.

1276


What is time invariant system?

1153


Difference between megger test equipment and contact resistance meter test instruments?

1319


please send me last 5 year interview questions

2186


WHAT ARE THE EFFECTS OF SERIES RESONANCE AND PARALLEL RESONANCE ON THE CIRCUITS PARAMETERS?

2058


What is the most essential condition for the voltage build up for a d.c. Shunt generator?

1143