Answer Posted / amita
Take there are 2 projects P1 and P2.
You are already login into project P1, then see in the
right hand side of the application, there is option called
TOOLS, click on that and u will get a option CHANGE
PROJECT, click on that and then click on select, u can move
to the project P2 this way.
| Is This Answer Correct ? | 4 Yes | 0 No |
Post New Answer View All Answers
Can you retrieve a test case once you have deleted them in test director?
Can we map the defects directly to the requirements (not thru the test cases) in the test director?
What r the views in testdirector?
How do I run reports from test director?
What is the use of test lab in test director?
I installed TestDirector 7.6 on my PC which has windows media center edition. It was working fine in the begining. But now when I try to start it, I get the message, "cannot connect to databas. The data base version is older than 7.5, please update database". I am using MS Access as the database. Any help would be appreciated.
How to use testdirect like a dashboard?
Disavantages of document generator? How to take a print out of the steps in the Parameterized scripts?
What is the Change management ?
can we connect qtp 8.2 version with test director 8.0 verion if how if not why 2)when test director 8.0 version released
how will you do execution workflow, creat and modify test sets
-QAINSPECT Difference between WEBINSPECT and WINRUNNER/TEST DIRECTOR?
how do u call data file and gui file in testdirector
How to generate the graphs in test director?
What are the various types of reports in testdirector?