Answer Posted / sra1
combine all major level module and get system level module.
check the whole system based on software requirement
specification.
it is done by tester
100% black box testing
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Assume a login page, and you have written 10 cases(say for example). How will you justify that these 10 testcase suffient for the login and how do you say this is 100% satisfies the need.
What is the difference between IE, Opera & Mozilla Firefox in web Testing and which brower will think that is much better?
Sentence "Working from onsite is effective" is growing in IT field. How do we bring that knowledge to offshore and do an effective job in Offshore?
What is test closure?
What r the features,u take care in prototype testing?
What is the difference between code walkthrough and code review? What is the difference between walkthrough and inspection?
There is an opening in our organization Sierra Atlantic, Hyderabad. All Manual test engineers with 2-3 years of experience can forward your resumes to mah_cs82@yahoo.com before May 01, 2008. (Only manual testers) with a covering letter, current CTC and Expected CTC.
hi this is satish can some one help me out by sending the maxium notes on client sesrver ,web server and company architechture project hirearchy and company hirearchy i will happy to recive the answers as early as possible
Usually customers won’t give all the requirements. How will you manage & collect all the necessary information?
Hi Friends, I've to submit a presentation in my office about "Different bug tracking tools" ? Where can i find (or any site) the templates for the bug tracking tools.
Write the 10 high test cases for making video call/face time
What are some best practices that you should follow when writing test cases?
which of the following is not a coding defect? Option 1 Test harness defect Option 2 Data flow defect Option 3 Initialisation defect Option 4 Algorithmic defect
wat is test management ?what are the components available in test management?
What does you mean by positive and negative testing & what is the difference between them. Can anyone explain with an example?