Answer Posted / sreenu
HI
i don't think so , it will take system down time, so what is
the need of doing that..
With early delta initialization, you have the option of
writing the data into the delta queue or into the delta
tables for the application during the initialization request
in the source system. This means that you are able to
execute the initialization of the delta process (the init
request), without having to stop the posting of data in the
source system. The option of executing an early delta
initialization is only available if the DataSource extractor
called in the source system with this data request supports
this.
Extractors that support early delta initialization are
delivered with Plug-Ins as of Plug-In (-A) 2002.1.
You cannot run an initialization simulation together with an
early delta initialization.
| Is This Answer Correct ? | 9 Yes | 3 No |
Post New Answer View All Answers
What are events and how you use it in BW?
What is the ?$? as an authorization value?
Give an example for this URL command?
What are the data loading tuning one can do?
How can a cube have partitioned for which the data already exists?
What is update mode for master data?
How do you do EURO conversion at the database level?
can any one give me a senario for generic data source extraction? why u go for infosets and multiproviders ? give me a senario for each? what is time stamp, calday, numpt? what is safty intervels, y we set lower lt and upper lt?
Explain the usage of geo-coordinates ?
What are the other BW processes?
What are nodes?
How do start routine and return table synchronize with each other?
What is the function module to convert currency?
Explain tickets?
Give the step by step approach to set up LIS?