How did you reconcile source with target?

Answer Posted / hemachandra

If you want to prepare Reconciliation report source with
target use the datastage internal function DSGetLinkInfo.
This function will show you how many records extracted from
source link and how many records loaded into target link.

Is This Answer Correct ?    6 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the use of hoursfromtime() function in transformer stage in datastage?

819


Difference between data warehousing and olap?

839


i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu

2490


Differentiate between hash file and sequential file?

809


How to read multiple files using a single datastage job if files have the same metadata?

1003


Explain the importance of surrogate key in data warehousing?

940


Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how

1348


Differentiate between odbc and drs stage?

815


which r the connectors used in san?

1988


What is the process of killing a job in datastage?

775


Define APT_CONFIG in Datastage?

865


What is the difference between server job and parallel jobs?

924


What are the different options associated with dsjob command?

1208


Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.

2670


What is the project in datastage?

889