Answer Posted / hemachandra
If you want to prepare Reconciliation report source with
target use the datastage internal function DSGetLinkInfo.
This function will show you how many records extracted from
source link and how many records loaded into target link.
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
What is the use of hoursfromtime() function in transformer stage in datastage?
Difference between data warehousing and olap?
i have a job with 3 possibiliies finish with ststus ok abbort warning how do you handle these 3 in job sequence? explain the situation where you have appiled scd in your project? chandu
Differentiate between hash file and sequential file?
How to read multiple files using a single datastage job if files have the same metadata?
Explain the importance of surrogate key in data warehousing?
Hi All , in PX Job I have passed 4 Parameters and when i run the same job in sequence i dont want to use those parameters , is this possible if yes then how
Differentiate between odbc and drs stage?
which r the connectors used in san?
What is the process of killing a job in datastage?
Define APT_CONFIG in Datastage?
What is the difference between server job and parallel jobs?
What are the different options associated with dsjob command?
Hi guys, Please design a job for dis requirement with derivation(solution). my source table like dis. emp_no qualification 1 a 1 c 2 a 3 c 3 b To loaded to target like dis emp_no qualification 1 b 2 b 2 c 3 a my requirement is every employer have three qualifications i.e a,b and c. what qualification missed in source table that will be move to target systems. Hope u got it the requirement. Right Thanks.
What is the project in datastage?