I WANT TO KNOW LONGFORM OF CT/PT USEDIN POWER PROJECTS OR
HT SWITCH YARD.
Answer Posted / minal
In power projects, CT stands for current transformer & PT
stands for potential transformer. These transformers are
used for metering purposes.
CT is connected after or before circuit breaker to measure
the current flowing through circuit breaker.
PT is used for measuring voltages of line also.
| Is This Answer Correct ? | 33 Yes | 1 No |
Post New Answer View All Answers
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
how to determine the inrush current of a transformer
How is operate breaker failure scheme in substation
How many types of colling system it trformers?
Explain RLC circuit?
why single phase to grd test in HV cable?why not 2 phase at a time?
how to select fuse rating for a 3-phase motor ???
electrical
The series field winding has low resistance while the shunt field winding has high resistance. Why?
Can RCD's used to protect the VVVF drive if not why.
what types of cable used in underground coal mining?
what are the parameters plays a major role in Potential transformer Burden calculation??
What is acsr cable and where we use it?
What are the advantages of instrument transformer?
What is the difference between the transmission line and distribution line?