Who will change the Bug Status as Deffered?
Answer Posted / saikat
All crap!!
The defect status is changed by the one who is responsible
for defect management for that project.It can be the PM,PL,
Test Manager, Test Lead, Test Engineer. It can be
anyone.Any status of the defect is ideally changed by the
one who is responsible for defect management. It can be a
formal process or an informal one dpeending on the [roject
volume/ priority/deadlines/budget etc.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
1. Give me an example of something you tried at work but did not work out so you had to go at things another way. can somebody give a real time example
What is deferred status in defect life cycle?
Unit Testing can be done by using Nunit?
what types of bugs will we find out in banking projects
. Is any graph is used for code coverage analysis?
How do you go about testing a project?
What are the cases why parameterization is necessary when load testing the Web server and the database server?
hi, this is geetha, i have one doubt regarding the vulnerability testing. For sql injection testing is there any need for the tools to be installed. If it is what is tool and what is the method to test in sql injection testing. Plz Guide me
During alpha testing why customer people are invited?
What do you plan to become after say 2-5yrs (Ex: QA Manager, Why?)
6 what do you like least about testing?
What is bug severity?
how to test ecg machine?
What is the difference between white box, black box, and gray box testing?
Should testing be done only after the build and execution phases are complete?