what are the basic parameters considered in designing a
pavement?
Answer Posted / selvamani
CBR value,
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the method of soil replacement test?
Why do you want to work here
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
What tor stands for in tor steel?
may i know the detailed description of cutting length
afe or not
How musch steel i.e. angles, channels,and square pipes are required per square feet for a steel roof of residential two storied building?
What in bending moment, if a moment is free end of cantilever beam?
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?
What is passive earth pressure ?