Which of the following is a measure of the size of an
information system based on the number and complexity of a
system?s inputs, outputs and files?

A. Function point (FP)

B. Program evaluation review technique (PERT)

C. Rapid application design (RAD)

D. Critical path method (CPM)

Answer Posted / guest

Answer: A

Function point (FP) analysis is a measure of the size of an
information system based on the number and complexity of the
inputs, outputs and files with which a user sees and
interacts with. FPs are used in a manner analogous to LOC as
a measure of software productivity, quality and other
attributes. PERT is a network management technique used in
both the planning and control of projects. RAD is a
methodology that enables organizations to develop
strategically important systems faster while reducing
development costs and maintaining quality. CPM is used by
network management techniques such as PERT, to compute a
critical path.

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

WHICH OF THE FOLLOWING IS OFTEN AN ADVANTAGE OF USING PROTOTYPING GOR DYDTEM DVELOPMENT

2974


purchase orders issued to vendors have been authorized as per the authorization matrix

1202