in HT service 3ph 4 wire service Y-phase voltage shows zero . whether it is meter fault? or what be the reason ? if y-ph voltage zero ,can current is recorded? reasons for failure?
What is NGR . What is the purpose of 10 sec ,60 sec rating of NGR.
Why you are switching off arc protection mcb when you are taking shutdown for lv board.
Why it is necessary to isolate fire fighting when you are taking shutdown for lv board.
How you give clearance to a spare feeder.
Operation of isolators.
Load transfer in 11kv double busbar switchgear - operation.
How to check the cable fault / hv test of transformer cable.
How to do maintenance of transformer feeder.
Single line diagram for dbb (double bus bar)system.
How earthing of switchgear system to be done.
What are locations arc protection relay is fixed.
Zone of protection and tripping scheme of arc protection relay.
High speed earth switch operation with diagram
If breaker is undefined position, first step to do.