What are some important tables used in pp (production planning)?
Explain what is the need of mrp list if the stock requirement list is already given?
How you get the ticket?
What is the use of infogroups?
Explain the uses of the simple maintenance interface?
Can't one material be assigned to more than one operation in a routing?
Where we have to specify the teardown time in one operation?
How to insert an inspection checkpoint at the end of an operation?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What is mrp list and what is the use of it?
Scheduling times can be defined in the material master record by?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
What is mrp controller means?
What is the difference between indian and us payroll?
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?