How to pass accounting entry for a tender cost and under which head? and how to show joint venture in venture's accounting books?under which head?
2503selling price = shs. 200, variable overhead-selling per unit= shs 80, variable production cost per unit = shs 60, fixed selling cost = 2,840,000. the production capacity of the project is 200,000 units. required P/V ratio, BEP and margin of safety
1976what is the effect of injection volume calculate flow rate in perkin elmer headspace? (ccm parameter in HS)
1 3010what is the treatment for employee contribution and employer contribution in in pf in accounts under which head??
1617i have some csv files in a directory which have sub-directories also. now how can i merge all .csv files in to one with a single header. for example: have some 4 files. 1.csv--------name,age,sal abc,25,4000 2.csv--------name,age,sal vgd,32,3500 3.csv--------name,age,sal hfg,20,5000 4.csv--------name,age,sal asd,15,2000 now my output file should be like 5.csv----------name,age,sal abc,25,4000 vgd,32,3500 hfg,20,5000 asd,15,2000 and please explain the code for me. as i am new to scripting. thank you in advance
1771i need to now what will be the cable size to the following load, transformer to distribution panel distance 110m, load 1000kw, voltage 400v, pf 0.85, permissible voltage drop 2.0%, overhead line, atmospheric temperature 35 degree c.
1575In gas chromatographic analysis sometimes we use headspace, why it is required instead of manually injection?
1 4699Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.
1701Can i have different delivery plantsa at header and item level in a sales order? Lets says that i have 3 items in a sales order with different delivery plants, how will this effect delivery creation?
1 10267what is purpose of maintain partner determination for sales document header and sales document item
IBN,
1 4128
Juxtapose the HTTP verbs GET and POST. What is HEAD?
How would you attach pictures in column headers of List View Control?
Can a meta tag be used to set the Expires header?
What is the syntax of the Expires header and how to set it?
What does the error Too many ``Received'' headers - suspected mail loop mean?
Describe a finite state machine that will detect three consecutive coin tosses (of one coin) that results in heads.
How to use the Find Error entry under the search heading of the menu bar?
How would you attach pictures in column headers of List View Control?
How would you add column headers in listview control?
what is be the overhead, if i use binary transmission. and will it be sent using xml text or how ?
I am stuck up with a question on appending of two arrays
I am writing the code for the same, I am appending two
strings this way
int main()
{
string s1 = "Welcome to C++";
string s2 = "C++ improves the logic ability";
string s3 = s1 + s2;
cout< I am a newbie to QTP / Automation testing. I want to
develop a script that creates a data file automatically
with proper headings using VBScript in QTP. hi this is seenu from hyderabad. i hav completed mba
(distence).buy i after tht i did pgdca and .net course
after tht i joined job as a software engineer .now i got
h1b visa appointment in chennai octo 30th now i hav exp two
years only but i put four years exp as a software
engineer .now i got job as a program analyst same company
head office in usa . my employeer only suggestme like put
four years exp like tht . this is my profile plz can anyone
can tell which questions they ill ask and give me
suggections . I have a requirement from the SD people wherein whenver one
runs the tcode F-02 (Enter G/L account Policy : Header
Data), they should not get the list of all acounts in the
ACCOUNT field. But when i go to pfcg to check for
restricting the list, i dont find any pertinet auth field
for doing so. Isi t something that we can ( as Basis Admin)
do or the ABAPpers to do. Maybe the ABAPpers have to
program the screen where in they need to restrict the list
options. If not so, lemme know the auth field that has to
bet set if any. Assignment
A software house got a project to automate sales/purchase
department of a furniture store. The store management is
clearly transferred their requirements to the software
house management. There is no chance of changing the
requirements afterwards.
Software house management use waterfall process model to
make the project.
Given is the progress flow of water-fall process model
In waterfall process model, the deliverable (document)
produced in one phase serves as an input to the next
phase.
Suppose you are a project manager who is leading this
project. It is decided to work and complete the project
using waterfall process model approach. You are required to
develop a plan in which the key task is to decide the
deliverable that should be built during and after
completion of each phase. Also give a description or
required contents that must be included in those
deliverables.
You are not supposed to make the complete project. All you
are required to do is to make a Project plan. In that, you
need to give a set of deliverables (documents) which
according to you, should be developed in each of the phase
(Requirements, Designing, implementation, Testing,
Maintenance). Also provide contents which should be there
in each deliverable. The contents should be clear and have
brief explanation.
Note:: There are one folder and one file in the attached
folder. The file is named as Assignment 4 write-up which is
your assignment write-up. The other folder named Project
deliverables is the folder in which you are required to
organize and place your deliverables. Name of the
document/deliverable saved in each folder should be
mentioned in the file named checklist (This file is placed
in the “Project deliverables” folder)
For Example
If you produce a deliverable named Requirement
Specification (RS) in the “Requirements” phase. You need to
do following tasks
1) Finalize the RS contents
2) Save the file in sub-folder named Requirements
3) Write the name of this document in the checklist
file under the heading Requirements.
Similarly, you need to make and save deliverables of each
phase. Not all phases contain one deliverable. There must
be some phases having more than one deliverables.
PLEASE SIR PRIVIDE ME THE CHECK LIST FOR GIVE SENERION ?
CHECKLIST ARE:
1-Requirements
2- Designing
3- Implementation
4- Testing
5- Maintenance