I want to prepare a patch installation for my company. I
need all the files which have been modified since Jan 09.
I have taken the history of project in VSS, for date range
01Jan09 to today.
Now whats the procedure of getting all those files to my
local directory, which is being used for a patch install
preparation.
Thanks.
No Answer is Posted For this Question
Be the First to Post Answer
How do I get deleted files (not permanently deleted)?
How to Structure and Partition your Project?
How to Undo a Checkout?
How can I get around the synchronization issue such that deletes and renames from VS.NET do not get synchronize with VSS as described in Q305516?
The integration isn’t working between VSS and VB/VC. What can I do?
If the Allow Multiple Checkouts option is enabled, what type of files can I allow multiple users to check out simultaneously?
How do I disconnect VSS from a particular VC project?
How can I use SourceSafe to version stored procedures with Visual Studio 6.0 and SQL Server 7.0?
I've checked out and modified my files. At what point do the copies stored in the Visual SourceSafe database get updated?
can database be accessed without sharing the folder.
Tell me can database be accessed without sharing the folder?
Is VSS Y2K compliant?