What is Program Isolation?



What is Program Isolation?..

Answer / s

Program isolation is used by the IMS to ensure data
integrity when the databases are accessed by a single IMS
subsystem.It maintains tables in the IMSCTL region address
space about the locks held for the database.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More IMS Interview Questions

how to create a changeman read only audit and update only audit Specifications for the Read only Audit 1) Read HFFD database unqualified. 2) Read FDRT, FDDM, FDAP segments. If FDAP-APP-STS is ‘2’ read the FDAV segment and get the FDAV segment which has FDAV-APV-OPTION as ‘X’ If FDAP-APP-STS is ‘5’ read the HFAC database. Read the ACRT segment qualified based on the key obtained from the FDAP segment from HFFD database. Conditions for writing into output file: a. App Type should be NEWR b. App Status should be 1, 2 & 5. c. Write 50 records per app status. For e.g. first 50 records for App status 1, 2 & 5 each The output file should contain the following fields from the database FDRT-COMP-CTRY-CODE X(03). FDRT-CUST-ID-NUM X(10) FDDM-DEM-SEQ-NUM X(01) FDAP-APP-SEQ X(02) FDAP-JNT-IND X(01) FDAP-APP-STS X(01) FDAV-APV-OPTION X(01) FDAV-APV-DT X(06) FDAV-APV-AMT X(07) ACRT-ACCT-NUM X(06) ACRT-SEG-BUS-TYPE X(02) ACRT-NM1-LAST X(19) ACRT-NM1-SS X(09) ACRT-NM1-1ST X(12) ACRT-NM1-INIT X(01) ACRT-NM1-SFX X(03) ACRT-NM1-TITLE X(02) PSB – DVAN2BMP In case you get a GE for any of the conditions, write to output file along with the details of the database segment which was not found. We need to complete this whole process by tomorrow. Run the audit in DLI mode. 2) Sort the output file created in step 1 on Cust ID, Dem Seq & App Seq. Specifications for the Update Audit 3) Take the output of step 2 as input for an update audit. Details are as follows: Read each record & check the app status. If app status is less than 2 then update the FDAP-NEW- MONEY-ENT to $25000.00 PSB - AUDBMPJ The job would be a BMP job. The test job would be run in IMSE region. Note - The proc (which will be called by the job) and the job should also be present in the change-man package itself. You’ll have a test job in your PDS along with overrides to execute the program in test regions. The job would be a DLI job. The test job would be run in IMSE region. It’ll have the following steps. 1) Delete-define output and error files. 2) Use a copybook for the output layout.

0 Answers   Cap Gemini,


I am totally confused on IMS message segments. When I create a message and it contains 5 segments does the entire message have a 32k limit or does each segment have a 32k limit? Is there a setting in the stage1 sys gen that defines if a transaction can receive/send multi-segmented messages?

1 Answers  


What is bmp mode?

0 Answers  


What is meant by mpp mode?

0 Answers  


what is the use of ENTRY in IMS?

3 Answers   CGI,






What is the difference between HDAM & HIDAM DB types and when would you use each?

1 Answers  


What is meant by bmp mode?

0 Answers  


15. Secondary indexes can be used with following databases a. HSAM,HISAM,HIDAM b. HIDAM, HISAM c. HDAM, HISAM, HIDAM d. All the above

2 Answers  


What is mpp mode?

0 Answers  


How do you write a PSB code ?

3 Answers  


How does one reorg an HDAM IMS database when changing RAPS (Root Anchor Points)?

2 Answers  


What is the maximum number of pcbs allowed in a psb?

0 Answers  


Categories