what are the different ogg initial load methods available?
Answer / Uttam Samajpati
The Initial Load (IL) in Oracle GoldenGate can be performed using one of three methods: IL_CONCURRENT, IL_CHAINED, and IL_COPY.
| Is This Answer Correct ? | 0 Yes | 0 No |
what does the goldengate csn equate to, in the oracle database?
what are the main components of the goldengate replication?
with integrated delivery, where can we look for the performance stats?
what are the most common reasons of the replicate process slowing down?
why would you segregate the tables in a replication configuration? How would you do it?
what is the difference between classic and coordinated replicat?
what are the different data encryption methods available in ogg 12c?
how to configure credential store in ogg 12c?
how do you enable oracle goldengate for oracle database 11.2.0.4?
why should I upgrade my goldengate extract processes to integrated extract?
how is the restartcollision parameter different from handlecollisions?
I want to configure multiple extracts to write to the same exttrail file? Is this possible?