Explain about RECORDING MODE Clause
RECORDING MODE clause specifies the format of the physical records
Recording mode F (fixed) -
Recording mode V (variable)
Recording mode U (fixed or variable)
Recording mode S (spanned)
FILE-CONTROL.
SELECT INPUTF ASSIGN TO INF.
SELECT OUTPUTF ASSIGN TO OUT.
SELECT WORK ASSIGN TO WRK.
DATA DIVISION.
FILE SECTION.
FD INPUTF.
01 INPUT-STUDENT.
05 STUDENT-ID-I PIC 9(6).
05 FILLER PIC X(74).
FD OUTPUTF.
01 OUTPUT-STUDENT.
05 STUDENT-ID-O PIC 9(6).
05 FILLER PIC X(74).
SD WORK.
01 WORK-STUDENT.
05 STUDENT-ID-W PIC 9(6).
05 FILLER PIC X(74).
WORKING-STORAGE SECTION.
01 VAR1 PIC 9.99 VALUE '124'.
01 STRING1 PIC X(10) VALUE 'ARPITA' .
01 STRING2 PIC X(10) VALUE SPACES.
01 VAR2 PIC 9.99 VALUE '1.24'.
01 VAR3 PIC 9.99 VALUE '.123'.
01 VAR4 PIC 9.99 VALUE '12.4'.
* 01 VAR5 PIC 9V99 VALUE '1.23'.
01 VAR6 PIC 9.99 VALUE '12.5' .
01 VAR7 PIC 9V99.
PROCEDURE DIVISION.
SORT WORK ON ASCENDING KEY STUDENT-ID-W
USING INPUTF GIVING OUTPUTF.
DISPLAY 'SORT SUCCESSFUL'.
MOVE '123' TO VAR7.
DISPLAY 'FIRST VAR7 SENDING :' VAR7.
DISPLAY 'FIRST VAR6 SENDING :' VAR6.
*-------------------------------------------------------------
* USING FUCNTIO LENGTH
*-------------------------------------------------------------
MOVE STRING1 TO STRING2(1:FUNCTION LENGTH(STRING1)).
DISPLAY 'STRING 2 ' STRING2.
*-------------------------------------------------------------
* USING FUCNTIO OF SPECIAL REGISTER
*-------------------------------------------------------------
MOVE STRING1 TO STRING2(1:LENGTH OF STRING1 ).
DISPLAY 'STRING 2 ' STRING2.
STOP RUN.
logic 2
FILE-CONTROL.
SELECT INP ASSIGN TO INF
ORGANIZATION IS SEQUENTIAL
ACCESS MODE IS SEQUENTIAL.
DATA DIVISION.
FILE SECTION.
FD INP
RECORDING MODE IS F.
01 INP-REC.
10 STUDENT-ID PIC 9(3).
10 STUDENT-NAME PIC X(20).
WORKING-STORAGE SECTION.
01 WS-INP-REC.
10 WS-STUDENT-ID PIC 9(3).
10 WS-STUDENT-NAME PIC X(20).
* 01 INX PIC X(3).
01 ARRAY.
05 ARRAY-DEF OCCURS 3 TIMES INDEXED BY INX.
10 STUDENT-ID-TAB PIC 9(3).
10 STUDENT-NAME-TAB PIC X(20).
05 EOF PIC X VALUE 'N'.
01 STRING-A PIC X(30).
01 PRINT-CHAR PIC X(20).
LINKAGE SECTION.
01 CALL-VALUE.
05 CALL-LEN PIC S9(4) COMP.
05 CALL-CHAR PIC X(20).
PROCEDURE DIVISION USING CALL-VALUE.
OPEN INPUT INP.
SET INX TO 1.
READ INP INTO WS-INP-REC.
MOVE WS-INP-REC TO ARRAY-DEF(INX).
* DISPLAY STUDENT-ID.
DISPLAY STUDENT-ID-TAB(INX).
DISPLAY STUDENT-NAME-TAB(INX).
SET INX UP BY 1.
READ INP INTO WS-INP-REC.
MOVE WS-INP-REC TO ARRAY-DEF(INX).
* DISPLAY STUDENT-ID.
DISPLAY STUDENT-ID-TAB(INX).
DISPLAY STUDENT-NAME-TAB(INX).
SET INX UP BY 1.
READ INP INTO WS-INP-REC.
MOVE WS-INP-REC TO ARRAY-DEF(INX).
* DISPLAY STUDENT-ID.
DISPLAY STUDENT-ID-TAB(INX).
DISPLAY STUDENT-NAME-TAB(INX).
CLOSE INP.
DISPLAY 'LENGTH ' CALL-LEN.
DISPLAY 'CALL-CHAR ' CALL-CHAR.
IF CALL-LEN > 0 THEN
MOVE CALL-CHAR(1:CALL-LEN) TO PRINT-CHAR
DISPLAY 'PRINT-CHAR 'PRINT-CHAR
DISPLAY CALL-LEN
END-IF.
ACCEPT STRING-A FROM SYSIN.
DISPLAY 'STRING-A ' STRING-A.
GOBACK.
| Is This Answer Correct ? | 0 Yes | 0 No |
I have 5 generations in my GDG. How do I code in the JCL to consider all the 5 versions of the GDG ?
if we give TIME=0 how many sec that job/step
what is the meaning of keyword in jcl?what is is opposite?
There are 2PROCS in a JCL. I want following conditions to be carried out 1) 1st PROC should be executed as such In second PROC 2) First 4steps should not be executed 3) 5th step should not be executed 4) 6th and 7th step should be executed The change should be done only in the JCL and PROC should be untouched ?
Passing a variable parm from JCL to a cobol/db2 program
Write a jcl to execute a job by 7 a.m on Jan 20,1986 ?
Could you provide an example and its effect OF, Using COND on JOB and EXEC both ?
How can I write the joblog in the spool on normal end of a job step and direct the joblog to a dataset only if the step abends?
What does it mean by Restart and Checkpoint in JCL ? How are checkpoints being taken and what is their usage ? How to use Checkpoint macro on a JOBSTEP ?
Can an individual step be restricted from using all the jobs allowed cpu time?
Explain the hierarchy levels in jcl?
In my job I have 6 steps. Step01,02,03...step06. after executing step02 i want to skip step03 and want to execute step04. and once step04 is done then I want to go back and execute step03. once step03 is completed I want execute step05, 06 and so on... can any one tell me how do i do that???