A and B can finish a piece of work in 20 days .B and C in
30 days and C and A in 40 days.
In how many days will A alone finish the job?
Answers were Sorted based on User's Feedback
(A+B)'s 1 day's work = 1/20
(B+C)'s 1 day's work = 1/30
(C+A)'s 1 day's work = 1/40
Adding above, 2(A+B+C)=(1/20)+(1/30)+(1/40)
=13/120
A+B+C =13/240
To get A's work,(A+B+C)-(B+C)=(13/240)-(1/30)
=5/240
Therefore A can finishes the work in 240/5 days .ie 48 days
| Is This Answer Correct ? | 144 Yes | 7 No |
What is Proteomics?
If y=cos-1(cosx + 4sinx)/(17)1/2, then dy/dx is ?
what are databases used in bioinformatics?
What is a scoring matrix?
An electron is injected into a region of uniform magnetic flux density with the components of velocity parallel to and normal to the flux. What is the path of the electron?
What is a ?clean and run? reaction?
Did bacteria, archaea, and eukaryotes exchange transporter genes appreciably during the past two billion years?
what is an active ? (UML)
Are all members of transporter families confined to a particular organelle or to the plasma membrane, or are some family members found throughout cellular compartments in eukaryotes?
How will you value a biotech company as opposed to a consumer products company?
How do you customise database for blast?
A catalyst (a)always slows down the reaction (b)always starts a rection that would not have ocurred at all otherwise (c)causes changes in the rate of the reaction (d)changes the quantities of the products formed.