A and B can finish a piece of work in 20 days .B and C in
30 days and C and A in 40 days.
In how many days will A alone finish the job?
Answers were Sorted based on User's Feedback
(A+B)'s 1 day's work = 1/20
(B+C)'s 1 day's work = 1/30
(C+A)'s 1 day's work = 1/40
Adding above, 2(A+B+C)=(1/20)+(1/30)+(1/40)
=13/120
A+B+C =13/240
To get A's work,(A+B+C)-(B+C)=(13/240)-(1/30)
=5/240
Therefore A can finishes the work in 240/5 days .ie 48 days
Is This Answer Correct ? | 144 Yes | 7 No |
An electron emits energy (a) Because its in orbit (b) When it jumps from one energy level to another (c) Electrons are attracted towards the nucleus (d) The electrostatic force is insufficient to hold the electrons in orbits.
when is a Genome project finished?
In Reimer-Tiemann?s reaction, the reaction intermediate is (a) Carbene (b) Dichloro carbene (c) Carbonion (d) Carbonium ion.
Bootstrap analysis evaluates evolutionary trees by sampling columns from the original alignment with replacement (multiplying or removing some of them) and computing a proportion of times that a particular branch appears in the resulting trees. What is the main idea behind this approach?
? : BGLQ : : YDIN : VAFK
How do you find repeats within one DNA sequence?
what is Glycomics?
If the sum of n terms of two series of A.P are in the ratio 5n+4:9n+6 .find the ratio of their 13th terms
3 Answers Deloitte, IIT, Wipro,
Which of the following is a recursive set of production (a) S ?> a|A, A ?> S (b) S ?> a|A, A ?> b (c) S ?>aA, A?>S (d) None of these.
Image of point (3,8) in the line x + 3y = 7 is (a) (-1,-4) (b) (-1,4) (c) (2,-4) (d) (-2,-4)
Suppose you used the NCBI Blast server to look for a match to a fruit-fly gene. Suppose further that the best alignment contained this section of an alignment: Hit from database: XXXXXXXXXXXXXXNFSTSQ User sequence: SLEAEAAPASISPSNFSSSQ What do the Xs signify?
Will the plant able to produce electricity when the soil is dried up