What is rate for brick masonry work of 1.0 m3 in cm 1:6?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
How to take labor charges for construction of 1cum of concrete?
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
Where will be the maximum bending moment in a TEE Beam?
What is pre-stressed concrete?
What is a bearing capacity of soil?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
explain what do you mean by the property development.
What is meant by a context menu in a cad software?
what is civil engineer greatest strength and weakness?
I have an span length 16 ft c/c
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water