what is the definition of stress& strain.

PBL,

1 2056

what is called camber in the road ?

PBL,

1 1807

what is called super elevation of the road?

PBL,

1 1914

what is called the inverd level of mabhole chamber?

PBL,

1622

what does the grad of cement shows (denotes)?

PBL,

1141

can we use PPC for concrete wall, If yes, what is the concrete (PPC & OPC) grade for Non- load bearing concrete wall, load bearing concrete wall & for cellar retaining wall.

1223

how to calculate testing date

1222

how to calculate 110kv transmission line tower stub top and bottom diagonals

ACME,

1181

explain how to calculate top and bottom diagonals for transimission line tower foundation with prop setting

ACME,

1309

how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?

1527

How steel required for 823 sqm of flooring work in 150mm c/c in single jali?

1 1602

Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

BPSL,

1142

Difference between lime, distemper and plastic emulsion?

1227

what is differences between ferrock and concrete ?

1420

I have an span length 16 ft c/c

1052


Post New Civil Engineering Questions

Un-Answered Questions { Civil Engineering }

Define What is a kip?

720


show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation

1679


types of laps in column

1906


How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM

1498


Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?

1717






What in your past experience or education prepares you for the position for which you are applying

1695


how to find hardness of water?why it should be determined?

1572


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1416


HDPE pipe standard bends using for TSE irrigation? is it possible to use 30 degree?

1725


what is the name of shuttering oil used in oman

2248


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2385


construction workers how much time take one work or qty

1119


Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam

5118


what is box type waterproofing and how it is exsiccated and what is the method of doing box type waterproofing

1868


How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''