What is version control in bp and how versioning will happen in bp?
What is wait action?
How to choose a connector in blue prism ?
What stage attracts or catches the exception in blue prism?
By default, stages used in object studio are logged and those in process studio are not in blue prism. Is this true or false?
What are the steps to deploy blue prism applications?
What are the steps that need to be done before using the login agent processes(login process and logout process)?
Elaborate on how does a process a run in the control room
How blue prism professional administrations can be strong?
What is the use of deferring as a method for a multi-part process in blue prism?
What points are to be considered during the planning phase of automation.
What’s the max wait time for a web page to load?
How control room communicates with robot?
What is blue prism RPA?
What is meant by loop? Where we will use the loop stage?