Please explain the following and how these are working with PLC unit 1.I/O Module 2.I/O Device 3.Adaptor Card 4.Ribbon Adaptor 5.RS 485-FC
1547Post New Shree Mayur Engineering Electrical Engineering Interview Questions
Diff b/w Health care domain and Banking Domain?
SOUTH ATLANTIC OIL AND GAS INC.is a fraud company
Explain about dco?
List three advantages of the packet switching technique compared with that of circuit switching.
If your direct manager was instructing you to do something you disagreed with, how would you handle it?
How do you approach learning a new AI framework or technology?
What is white noise sound?
Which is better ost or pst?
Explain what are directives ? Mention some of the most commonly used directives in Angular.js application ?
What is the purpose of jquery?
Where is proxies.dcu?
What are attribute roles?
What you think that you have achieved?
You are working on a project that was proceeding well until a manufacturing glitch occurred that requires corrective action. It turns out the glitch was an unintentional enhancement to the product, and the marketing people are absolutely crazy about its potential. The corrective action is canceled, and you continue to produce the product with the newly discovered enhancement. As the project manager, you know that a change has occurred to the project scope. Which of the following is true? A. Project scope changes do not require CCB approval. B. Performance measurement baselines are affected by scope changes. C. Project scope change uses inspection to determine if change has occurred. D. Project scope change uses workarounds to correct unexpected problems with scope change.
What is a socket in a server?