I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.
2010Post New Duke Energy Electrical Engineering Interview Questions
What's the “kernel trick” and how is it useful?
Explain various types of controllers?
Draw the Layout of an Inverter?
What is final?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
How is rsa used for authentication in practice? What are rsa digital signatures?
What is technically difference between in Table creation in table creation maintenance not allowed ,maintenance allowed with restriction, maintenance allowed ?
Why do we use sendredirect() method?
In what ways blue prism is not quite the same as uipath?
How do I create a single-file assembly?
What is cscript exe?
How To Handle Or Missing Data In A Dataset?
What is excel and what is it used for?
You have been give n the responsibility of creating an e- learning course on credit cards in seven days. You are on schedule for the first three days, on the fourth day, your favourite cousin comes to hyderabad and asks you to show him around. What would you do??
We had a number of reports scheduled to run at various times. This worked fine for at least a year, now it is the second time round we lost all the scheduled jobs, with no apparent reason we can find. Any ideas?