hello friends ,i have exam in Hsbc,pls any on send me placement papers and technical questions on mainframes,thank u
2103Post New HF Interview Questions
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is the difference between applications and applets?
Where can I find impala documentation?
What is data set in c#?
Where do we use trace frag?
Explain the aggregator transformation?
In order to bind the data from a data source to the Repeater control what property is set and what method must you call in your code,?
What difference between fields and single value fields?
What is variable and explain rules to declare variable in c?
What is a c++ map?
Where do you define an assistance class?
What are the different input parameters types in sap hana?
What causes no suitable driver error?
Can you change the listening port from default to something else?
What is hibernate model class?