Write a C++ program which will compute the volume of a sphere or a cylinder after prompting the user to type the first character for the shape name.
1699Post New An-Najah National University C++ General Interview Questions
What are the most important modules in crm?
How many columns are in access?
8. How many E1s are supported by one E1 card in BTS
Which dog is not a dog?
Is node js good for enterprise?
How do I format in visual studio?
What is latest version of mvc?
What are the hardware communication interfaces present in the raspberry pi?
How do I fix regsvr32 exe error?
Does hashmap allow null keys?
What is delay angle or what is firing angle of phase controlled rectifier?
What is the lifespan of rccs?
What is "fatal error/rdbms code 3996" error?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
Whether the default hello timer value is same across STP,RSTP and MSTP