Company Name Starts with ...
#  A  B  C  D  E   F  G  H  I  J   K  L  M  N  O   P  Q  R  S  T   U  V  W  X  Y  Z

An-Najah National University C++ General Interview Questions
Questions Answers Views Company eMail

Write a C++ program which will compute the volume of a sphere or a cylinder after prompting the user to type the first character for the shape name.

1699

Post New An-Najah National University C++ General Interview Questions


An-Najah National University C++ General Interview Questions


Un-Answered Questions

What are the most important modules in crm?

563


How many columns are in access?

433


8. How many E1s are supported by one E1 card in BTS

2574


Which dog is not a dog?

510


Is node js good for enterprise?

235






How do I format in visual studio?

431


What is latest version of mvc?

1


What are the hardware communication interfaces present in the raspberry pi?

1


How do I fix regsvr32 exe error?

520


Does hashmap allow null keys?

476


What is delay angle or what is firing angle of phase controlled rectifier?

612


What is the lifespan of rccs?

599


What is "fatal error/rdbms code 3996" error?

668


Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.

1765


Whether the default hello timer value is same across STP,RSTP and MSTP

2310