what is dividend? how do the use an accountancy?
How to filter boolean field in soql?
What is conversion optimization?
What are client dependant objects in abap/sap?
Q:Hi all,i want accurate answer with code using in built functions.please sent me code as soon as posible. I have program nmed PGM1 which '' RETRIEVE Current production date''should correctly default the production date for the user who is issuing raw materials to the manufacturing.The production date can be different from the celendra date. However, the program does not make the correct adjustment for all manufacturing plants. there is a parameter which determines the production start time e.g. 07:00 if the system time precedes this,the program subtracts one from the celendra day.This work fine when the celendar day starts after production day as it does in England,the system should be adding one to the celendar day during the overlap. unfortunately the program was desined to assumed the celendar day always starts before the production day. Change required in the program: Change the PROGRAM PGM1 to use the new parrameter to decide whether to add or subtract 1 from the celendar day when determining the production date.
List down various approaches for machine learning?
What are integer variable, floating-point variable and character variable?
Explain the Window Azure platform?
What are spring jdbc templates used for?
How can we find what are the modules loaded in apache?
The operation being performed by the 8085 can be checked by which pins?
How do I open a path in cmd?
How to set specification of assay, fisdolution and related substances?
What is dba in dbms?
Can microsoft word do calculations?