Answer / kumar
: Material Master - MM01
2: BOM creation - CS01
3: Work Center creation - CR01
4: Route creation -CA01
5: PIR Generation -MD61
6: MRP Run - for Total Planning - MD01
for Single-Item, Multi-Level - MD02
7: Evaluation through MRP list and Stock requirement list -
MRP List -MD05,
Stock Requirements List - MD04
8: Conversion of Planned order to Production order - With a
planned order -CO40
With material - CO01
9: Order management - Change >With material CO02
10: Confirmations- For order CO15
For Operation -For time ticket -CO11N
11: Goods issue - MB1A--261Movement type
12: Goods receipt - For Order MB31
13: TECO or Close Order- from Prod. Order Header menu.
Is This Answer Correct ? | 39 Yes | 5 No |
Answer / jinchandramule
1:Material Master - MM01
2: BOM creation - CS01
3: Work Center creation - CR01
4: Route creation -CA01
5: PIR Generation -MD61
6: MRP Run - for Total Planning - MD01
for Single-Item, Multi-Level - MD02
7: Evaluation through MRP list and Stock requirement list -
MRP List -MD05,
Stock Requirements List - MD04
8: Conversion of Planned order to Production order - With a
planned order -CO40
With material - CO01
9: Order management - Change >With material CO02
10: Confirmations- For order CO15
For Operation -For time ticket -CO11N
11: Goods issue - MB1A--261Movement type
12: Goods receipt - For Order MB31
13: TECO or Close Order- from Prod. Order Header menu.
14:Ko88 Order settlement
15:kkbc_ord costing report
this is the pp cycle
Is This Answer Correct ? | 28 Yes | 0 No |
Answer / dheeraj
This is PP Cycle
First of all demand is generated for the product to be produced through demand management.
It calculates the quantities to produce and the time for the final assembly.
The data from demand management is transferred to MRP. The data from demand mgt can come from Customer Sales Order (firm)or Planned Order (forecast).
The MRP checks for the availability of material at various stages of BOM. In case material is not available MRP generated planned order and Purchase requisition for production of components in house and procurement from vendor respectively.
The planned orders are converted into production order by the planner and the purchase requisition are converted into purchase order by the purchaser.
Production in charge converts the planned order to production order and carries out the production activities once the order is released for production. Production is carried out as per the operation steps provided in the routing. Work centers are also mentioned with each operation in the routings where these operations are to be carried out.
Once the production is completed production confirmation is done and goods movement (delivery created) takes place.
Capacity planning is yet another part of PP which planes the capacities for various work centers. MPS is another tool which is used to plan out the master products. If MPS is to be run the inputs are provided from demand management to MPS. And the out put from MPS is then feed into MRP
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / shahid
Correct adding something
SOP is missing
valid upto Production Order steps (Different steps are there
for PP-PI and PP-REM)
Can be automated via backflush
Is This Answer Correct ? | 4 Yes | 1 No |
Answer / manickam
DEMAND MANAGEMENT-MPS(PLANNED ORDERS)-LT CAPACITY EVALUATION
(FIRMED PLANNED ORDERS)-DETAILED SCHEDULING(PRODUCTION
ORDER)-MRP(REQUIREMENTS)-
1.PRODUCTION ORDER RELESE-PRODUCTION ORDER CONFORMATION-WIP
DETERMINATION-G.R/G.I-RECORDING-SETTLEMENT-
ARCIVING&DELETIONS-MASS PROCESSING.
2.PURCHASE REQUISTIONS-PURCHASE ORDER-GR
Is This Answer Correct ? | 3 Yes | 7 No |
Answer / d.maran
demand creation
Production initialization
convertion of plnd order to prod order
goods issue
confirmation of prod.order
goods receipt
pls stock to warehouse
Is This Answer Correct ? | 4 Yes | 13 No |
What is the use of stock requirement list?
What is SOP and types of SOP?
What are the details in Production scheduling profile?
Explain the lsmw and the steps involved in them.
What is variant material ?
What are the common questions,asked at SAP PP Full time face to face interview?
What is milestone confirmation ?
define variable cost
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
How do you restrict the data to be entered in the payroll area?
How can we shut off the "automatic costing indicator" and the "automatic scheduling indicator" which go on when the production order is released?
Two or three Production Orders are there for the same day, and goods are not sufficient and then how to proceed?