1000 pieces you run mrp on that time use md02 or md01
Answers were Sorted based on User's Feedback
Answer / venkat
1000 pieces means I should use MD01, As MD02 is single item and multi-level planning.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / arun k
1000 pieces means, we need to use the md01 - total planning at plant level
Is This Answer Correct ? | 0 Yes | 0 No |
Explain how the pp module is organized in sap?
In implementation stage tell some standard scenario before AS-Is & TO-BE
Define standard cost
Do you want to use one BOM to represent several similar materials (closed variant BOM)?
Can't one material be assigned to more than one operation in a routing?
Different types of consumption based planning.
what is SOP ? define it .
Steps to configure Production order type.
Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
Can we create production order without bom and routing ?
What is default values at work center
Explain what is plm (product lifecycle management) in sap pp and what is the use?