Can it be configured in such a way that the external
requisitions can also be taken into account while MRP runs
in consumption-based planning if VB is selected as MRP type?
Answer / rajiv
Yes, reorder point can be set for ATP (Available to
Promise)..
Is This Answer Correct ? | 0 Yes | 2 No |
What are the special stocks used in mm?
What is mrp (material requirement planning)?
Explain the 'accounting' side of gr?
Why is the receipt of the goods imported to a company?
If I implemented mdm very recently, should I upgrade?
What is the movement type for goods issue reversal ?
What is the procedure to delete materials permanently from material master?
What are ‘transaction keys’ while setting obyc?
In SAP under Material Master how items will be codified?
What is the significance of Qty/Value update check box (e.g. by valueation area) in Material Type configuration?
What are the variousfeatures of consignment stocks?
What is split valuation? What are the settings reuired for it?