What is alternative bom
Answer / dev
1.When you create a BOM for any material for any BOM usage the first alternative BOM will be created
that is 01.
2.Suppose if the same product can be produced using 2 different BOM's then you can create 2 BOM's
for that product,that's 2 alternative BOM 01 and 02.
3.This 2 alternative BOM's can be created for a different validity dates or lot sizes and it can be
assigned to a production version.
4.Always the first alternative BOM will be picked by the system during MRP run if they have same
validity dates and lot size.
5.In some case one BOM will be used for inhouse production and the other one for sub-contracting
purpose.
Is This Answer Correct ? | 10 Yes | 0 No |
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
What is MPS and difference between MRP and MPS?
Integration between PP and PM module.
What is planning horizon?
what are the basics of PP ?
what do you mean by planning time horizon
Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
What is the use of plm (product lifecycle management) in sap pp?
What are gaps? Some examples?
what is the consumption based planning ?
2 Answers Gupta Power Infrastructure, Webcom,
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP