Integration of PP with MM , Integration of PP with SD .
Answers were Sorted based on User's Feedback
Answer / chaithanya
Integration of PP with MM is at the MRP stage, ie when the
material in stock is not at the required quantity, the
material request is sent to MM people.
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
Is This Answer Correct ? | 0 Yes | 0 No |
Difference b/w Co-product & by-Product
What are the different type of BOM usage?
What MRP does with Capacity overload
What are some important tables used in pp (production planning)?
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
1. how Product Cost Collector Works? 2. What are the master data for MRP? 3. In a production order without making goods issue, i should not be able to do goods receipt. How do we do it? 4. i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done. 5. for in-house production, planned order are generated & for external procurement purchase requisition. i want, system will go in external procurement to a particular vendor. what is the setting? 6. what are the problems you faced in MRP?
How is the processing time calculated in a wc when both labor, machine categories exist?
What is the use of infogroups?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
what do you mean by planning time fence
what is the diff. between NETCH,NETPL AND NEUPL