Integration of PP with MM , Integration of PP with SD .
Answer Posted / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what happens to planned after it has been converted into production order?
What is the use of QM control key?
What is group bom?
what is alternative item group
What are the steps of production execution process?
What are the MRP master data?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What is routing in sap pp?
How the processing time is calculated in a wc when both labor, machine categories exist?
Explain the process of Material costing.
List out the basic procedure for dispatching operations in capacity leveling?
What is Phantom Assembly?
What is 'capacity planning'?
Have you used Pull list or back flushing in REM?
What is the internal recruitment?