Integration of PP with MM , Integration of PP with SD .
Answer Posted / c.kartikeshwar
SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Difference between Routing, Ref op set, Rate routing and Ref rate routing.
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
Difference between PP and PI.
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
Mention what is the use of t-code cs20 in bom?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
How costing is affected the pp?
Which tool you are using
What is mrp group and what is the use of it?
What is primary cost and secondary cost?
What are the t-codes for creating, changing and summarizing bom?
What is Schedule Margin key. How floats works in scheduling?
what are the constraints of Variant configuration?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Explain LTP.