Integration of PP with MM , Integration of PP with SD .

Answer Posted / c.kartikeshwar

SAP PP and MM integration is starts with Material Availability check.And also when MRP run for Reorder point( Can be automatic or Manaual).
MRP2 view and MRP 3 view in Material Master the PP and MM integration is mostly linked

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Difference between Routing, Ref op set, Rate routing and Ref rate routing.

2341


We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?

611


Difference between PP and PI.

1618


How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks

2524


Mention what is the use of t-code cs20 in bom?

652






Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.

1581


How costing is affected the pp?

628


Which tool you are using

1365


What is mrp group and what is the use of it?

632


What is primary cost and secondary cost?

1256


What are the t-codes for creating, changing and summarizing bom?

661


What is Schedule Margin key. How floats works in scheduling?

2497


what are the constraints of Variant configuration?

1694


We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?

688


Explain LTP.

1027