Answer / rahu;
Total time for the in-house production or for the external
procurement of a product. In in-house production, the
replenishment lead time is determined to cover all BOM levels
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / mahendar
Replenishment Lead time is the time for material to become
available either from external procurement or in house
production.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / chitta
The time taken by the business to produce the material or
procure to make product available
Is This Answer Correct ? | 0 Yes | 0 No |
Answer /
It is a time taken process to make finished goods and dispatch
to the customer.
(Manufacturing time + Quality inspection time)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ashok reddy
It is the total time taken to manufactured the goods and make the goods ready for dispatch is known total replenishment lead time
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / dave
I have yet to see a correct answer. IT folks nearly always get it wrong. Some of the answers above are only correct in specific circumstances. People always miss the important of delivery/ship frequency. A transit and goods receipt time could be 7 days total. But if parts are being shipped from a supplier daily, the RLT for use in a formula, is 1 day. There will be 7 days of inventory in the pipeline. Not every material is Make to Order. It’s counter intuitive, but mostly just logic once understood.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / rajeshwaran
Its is the time taken to fill the the used stock. The fill
may be from supplier or through manufature
Is This Answer Correct ? | 3 Yes | 5 No |
Answer / mahesh
Srikanth is right..but If u r using Inhouse production time
then Planned delivery time is not applicable since planned
delivery time is used if u r procuring the material from
outside. We specify it as Procuremtn type in Material
Master.
Is This Answer Correct ? | 3 Yes | 9 No |
Answer / sailaja
Replenishment Lead Time is the difference between Stock
released from the picking location time - Stock replaced in
picking location time from stock reserved location time
Is This Answer Correct ? | 0 Yes | 8 No |
i finished my mba in 2004 on corres.so, i would like to join sap sd module . please give me suggetions about this.
WHAT IS THE DIFFERNCE BETWEEN CUSTOMIZATION AND CONFIGURATION WITH EXAMPLES
What are the customizing settings in pricing procedure for tax condition type?
One billing point, and 2 sales order point, isn't possible Ex: hyderabad,delhi ordering point and pune is billing point. if it possible mail me the configuration urgent thanks in advance
In third party order processing what are the standard G/L A/c's to be posted in ME21?
What is a posting block?
What is alternative condition base value? Give an example?
What is a variant and its use?
On which server End user training are given?
What is functional specification and tell me some fields in fs template?
What is the Difference between WM and EWM?
Even after Rebate agreement validity periods finish and the status is showing D completed still acuurals are calculating the accurals..for eg validity periods are finished at 2011 when we create billing document is creating in 2012 still accurals are calculating, where might be went wrong