What is the difference between Static and Dynamic Credit
Check?
Answers were Sorted based on User's Feedback
Answer / latha
Static Check and Dynamic check are maintained in Automatic
Credit control.
The main difference betn these two is
Static check : If u check this field the system will
consider all the open orders after the credit horizon date
while checking the credit limit
Dynamic check: If u check this field the system will check
the credit limit after the credit horizon date
Is This Answer Correct ? | 3 Yes | 14 No |
Answer / riyaj
static chek will carry out the open sales orders+open
deliveries+open billing+open items,
where as dynamic chek will carry out
statich chek+ partially completed sales orders
Is This Answer Correct ? | 5 Yes | 22 No |
Hi.After PGI the cost of the goods sold acoount debited. Where is this assgnment.where we can see this information.thanks
Hi ...I would like to know what all the documents we prepare in whole project execution? can anybody let me know , not just functional spec or UAT documents...can u please give me the list in sequence with phases? I would appreciate ur inputs.
To extend material one plant to another plant what are the configuration you done in your project?
Why we should assign a condition type (ex:pr00)while determining pricing procedure,if we assign PR00 why we should assign that condition type.
condition type amt k007/k004 should be rounded off eg eg rs 25.456 should be rounded to rs 26.oo in invoice
We want to explode bill of material automatically at time of order entry and explode an equipment bom in the sales order. What are the setting required?
What know about the back order process and what is the transaction code
sir,I haveprobem in MAster record i m creating a customer after item category sold to part going to address i m putting company,system asking for the transportaion,zone and other things which is not posssible.I got stuck.Pls tell me what to do Thank u Anand
How to create a billing document ?What is the transaction code?What is the transaction code for material posting ?
Explain about SOP (service operating procedure) and your role in it?
What is the difference between Static and Dynamic Credit Check?
What is Roll-Out project in SAP ? And where it will start and What knowledge SD consultant shouled needed ?