Answer / narendra deshmukh
In cut over activity of MM,
1.Upload the Material Master.
2.Upload the Vendor Master.
3.Upload the Excise Master.
4.Upload the Excise Register.
5.Upload the Open P.O.,Shed. Agreement,Contract,Invoice
Receipt.
Is This Answer Correct ? | 28 Yes | 0 No |
Answer / bala
Cut Over Process:
When we go for cut over, first of all we need to make sure
that all configuration are in place in production that is
thru the TR's which we have created...
Second, We have to do the manual configuration in
production before we go for cutover.
Third we have to move all the master data and transactional
data to production. Make sure that the sequence of the load
should be in proper. Otherwise it will be big problem while
loading...
Is This Answer Correct ? | 23 Yes | 1 No |
Answer / shuvankar
Detailed plans need to be developed for cutting over from
the old system(s) to the new. Parallel runs of what will
happen over the conversion period using test data, convert
and watch for a period after wards to ensure nothing
unexpected happens.
Is This Answer Correct ? | 13 Yes | 3 No |
Answer / sunil
For cutover In MM, Open PO, Sch.Agre.,Contract, and invoice
receipt.
Is This Answer Correct ? | 7 Yes | 3 No |
How to link SD with PO when stock shortage than sales order quantity?
What is meant by a credit memo?
Explain the terms planned delivery and gr processing time?
what is access number in access sequence how do we define that ?
What is ean?
What is meant by batches? How can the batches be searched?
How you will upload the open Pos in SAP through which tool? with steps....
What is the result of goods movement?
Explain rtp
Explain mrp type
How are batch numbers assigned?
What are the toold available for data migration? What is LSMW?