Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answers were Sorted based on User's Feedback
Answer / kishore kumar
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will
be
= 2x1.7x0.15 + (0.5-0.15)/3 x ((0.3x0.3+2.0x1.7+sqrt
((0.3x0.3)(2.0x1.7))
=0.981 m^3
| Is This Answer Correct ? | 98 Yes | 37 No |
Answer / vishal gajjar
h(=D-d)\3 * A1+A2+SqrtA1A2 = Q1
A1*A2*thickness = Q2
Q = Q1 + Q2.
| Is This Answer Correct ? | 40 Yes | 11 No |
Answer / suresh,trichirapalli
Q1=2.1*1.7*0.5
Q2=(0.5-0.15)/3*((A1+A2)+(SQRT A1*A2))
A1=Area of bottom portion
A2=Area of top portion
TOTAL QTY=Q1+Q2
| Is This Answer Correct ? | 22 Yes | 8 No |
Answer / s s grewal
Before calculating the quantity of concrete required for size of pillar or size of footing at (D=0.5 m)
Formula :- L X B X d + D-d/3 x A1 + A2 + √(A1 X A2)
| Is This Answer Correct ? | 22 Yes | 9 No |
Answer / manpreet singh
suppose area at bottom A1 = (AxB) and area at top A2 (axb), where A,B,a,b are the respective lengths of footing top and bottom. further D is total depth and d is small depth of footing
formula is A1xd + (D-d)x(A1+A2 + sqroot {(A1xA2)/3}
| Is This Answer Correct ? | 18 Yes | 11 No |
Answer / r. dilli babu
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=h/3(A1+A2+Sq root of A1square+A2square)
=((.5-.15)/3)(.09+3.4+(sq root of(.09 square + 3.4 square)))
=.116(3.49+(sq root of (11.5681))
=.116(3.49+3.401)
=.116*6.891
=.799 cum
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / sagar mistry
Here you have not given the column size.
So we assume column size 300mm X 300mm.
There is an Offset after the periphery of column & it is 75mm.
Rectangular Part
=L X B X H
=2 X 1.7 X 0.15
=0.51 cum
Trapezoidal Part
=(h/3)(A1 + A2 + SQRT ( A1 X A2 )
=((0.5-0.15)/3) ((2 X 1.7) + ((0.3+0.075)+(0.3+0.075)) + SQRT ((2 X 1.7) X ((0.3+0.075)+(0.3+0.075))
=0.12 ( 3.40 + 0.75 + 0.70 )
=0.57 cum
Total Concrete
=0.51 + 0.57
=1.08 cum
| Is This Answer Correct ? | 8 Yes | 4 No |
Answer / ashish parasiya
Question is not complete because one must require top are to calculate volume for trapezoid.
| Is This Answer Correct ? | 6 Yes | 3 No |
Answer / r. ansari
Formula for trapezoidal footing quantity
Q = h/3{(a+b)+√ab}, a&b is area of bottom and top portion
=0.5/3{2x1.7+0.15x0.15+√3.4x0.0225}
=0.583 Cu.m.
| Is This Answer Correct ? | 11 Yes | 10 No |
Answer / r. suresh
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=H/3(A1+A2+sq root of A1+A2)
=((0.5-0.15)/3)(3.4+0.09+ Sq root of 3.4+0.09)
=0.621 Cum
| Is This Answer Correct ? | 4 Yes | 3 No |
WHAT IS THE MELTING POINT OF STEEL?
how much used soil in 1 brick of standard size?
0 Answers Global Career Solutions,
what is a moment connection and shear connection ? where it provided ? why it provided ?
How to calculate soil bearing capacity of soil?
Isolated square footing quantity calculations
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
volume of 2 bulbs in pile of height 10' diameter 1'3''
What is absolute pressure? How absolute pressure is calculated?
what is stress
what are the changes in concrete pour height as per IS 456, 2009?
i need gate exam civil engineering question papers with answers
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)