Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.
Answers were Sorted based on User's Feedback
Answer / kishore kumar
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will
be
= 2x1.7x0.15 + (0.5-0.15)/3 x ((0.3x0.3+2.0x1.7+sqrt
((0.3x0.3)(2.0x1.7))
=0.981 m^3
Is This Answer Correct ? | 98 Yes | 37 No |
Answer / vishal gajjar
h(=D-d)\3 * A1+A2+SqrtA1A2 = Q1
A1*A2*thickness = Q2
Q = Q1 + Q2.
Is This Answer Correct ? | 40 Yes | 11 No |
Answer / suresh,trichirapalli
Q1=2.1*1.7*0.5
Q2=(0.5-0.15)/3*((A1+A2)+(SQRT A1*A2))
A1=Area of bottom portion
A2=Area of top portion
TOTAL QTY=Q1+Q2
Is This Answer Correct ? | 22 Yes | 8 No |
Answer / s s grewal
Before calculating the quantity of concrete required for size of pillar or size of footing at (D=0.5 m)
Formula :- L X B X d + D-d/3 x A1 + A2 + √(A1 X A2)
Is This Answer Correct ? | 22 Yes | 9 No |
Answer / manpreet singh
suppose area at bottom A1 = (AxB) and area at top A2 (axb), where A,B,a,b are the respective lengths of footing top and bottom. further D is total depth and d is small depth of footing
formula is A1xd + (D-d)x(A1+A2 + sqroot {(A1xA2)/3}
Is This Answer Correct ? | 18 Yes | 11 No |
Answer / r. dilli babu
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=h/3(A1+A2+Sq root of A1square+A2square)
=((.5-.15)/3)(.09+3.4+(sq root of(.09 square + 3.4 square)))
=.116(3.49+(sq root of (11.5681))
=.116(3.49+3.401)
=.116*6.891
=.799 cum
Is This Answer Correct ? | 8 Yes | 4 No |
Answer / sagar mistry
Here you have not given the column size.
So we assume column size 300mm X 300mm.
There is an Offset after the periphery of column & it is 75mm.
Rectangular Part
=L X B X H
=2 X 1.7 X 0.15
=0.51 cum
Trapezoidal Part
=(h/3)(A1 + A2 + SQRT ( A1 X A2 )
=((0.5-0.15)/3) ((2 X 1.7) + ((0.3+0.075)+(0.3+0.075)) + SQRT ((2 X 1.7) X ((0.3+0.075)+(0.3+0.075))
=0.12 ( 3.40 + 0.75 + 0.70 )
=0.57 cum
Total Concrete
=0.51 + 0.57
=1.08 cum
Is This Answer Correct ? | 8 Yes | 4 No |
Answer / ashish parasiya
Question is not complete because one must require top are to calculate volume for trapezoid.
Is This Answer Correct ? | 6 Yes | 3 No |
Answer / r. ansari
Formula for trapezoidal footing quantity
Q = h/3{(a+b)+√ab}, a&b is area of bottom and top portion
=0.5/3{2x1.7+0.15x0.15+√3.4x0.0225}
=0.583 Cu.m.
Is This Answer Correct ? | 11 Yes | 10 No |
Answer / r. suresh
Input is insufficient.size of the column is missing.
If size of the column is 300 x 300 mm, then the volume will be
=H/3(A1+A2+sq root of A1+A2)
=((0.5-0.15)/3)(3.4+0.09+ Sq root of 3.4+0.09)
=0.621 Cum
Is This Answer Correct ? | 4 Yes | 3 No |
What is the difference between normal brick & concrete hollow blocks in all aspects?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
How can we calculate the cement Quantity in M25?
2 Answers JK Associates, Vardhman, Wave Infratech,
RCC MEANS
What is Leastcount of 1. Total station 2. Theodolite 3. Dumpy level 4. Plane Table
What is the curing period for Epoxy grouts
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
What is the formulae of percentage of steel
what are the criteria for choosing the span for the bridge (highway bridge)
Differentiate orthographic and isometric projections?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
what is difference between curtain walling and glazing and spider system which are using in building external finish systems.