how many finice documents will system generates when goods
reciept from subcontracting made.
Answers were Sorted based on User's Feedback
Answer / narendra deshmukh
ONLY ONE ACCOUNTING DOCUMENT IS GENERATE,
THAT DOCUMENT CONTAINS SIX POSTING LINES
INVENTORY OF SEMIFINISH
GR/IR
CHANGE OF STOCK
SUBCONTRACT LAB.
CONS. OF RAW MAT.
INVENTORY OF RAW MATERIAL
REGARDS,
NARENDRA DESHMUKH
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / laxman kamulugari
In Subcontracting process once accounting document created
but six line items i.e
If Raw material
Invetory - Bsx - cr
Stock issu to subcontracyor - GBB-VBO - Dr
If Finished goods
Inventory - bsx - Dr
Change in stock - Bsv- Cr
Services
Purchase service - Bsa - Dr
Gr/Ir A/c - Wrx - Cr
Is This Answer Correct ? | 8 Yes | 1 No |
Answer / jack
For Subcontracting process these are the Accounting entries
we are identifying.
DR FG Stock/ SC By-Product Stock BSX
CR Change in Stock (FG/ SC By-Product ) (BSV)
(for finished goods received)
DR Subcontracting Charges (FRL)
CR GR/IR Clg (WRX)
(for moneys payable to Subcontractor)
DR Consumption (Components) GBB (VBO)
CR Change in Stock (FG/ SC By-Product ) BSX
(material provided to Vendor is now charged to expense)
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / basavaraj hiremath
If our po contents 2 components(which are to be sent for
subcontract) and 1 fg(which is to be received from
subcontract after job work) following accounting documnts
will be generated(8 a/c documents)
1. Stock A/c for FG - (+Dr)
2. GR/IR A/c - (-Cr)
3. Cost of FG - (-Cr)
4. Sub contract charges/Labour charges - (+Dr)
5. Consumption of Compenent-1 - (+Dr)
6. Stock A/c of Component-1(-Cr)
7. Consumption of Compenent-2 - (+Dr)
8. Stock A/c of Component-2(-Cr)
Above 8 documents are created when GR is happened.
Is This Answer Correct ? | 5 Yes | 0 No |
Answer / sathya
While we are doing subcontract GRN,material document of the
finshed product and the service charges of the finished
product will generate according to the subcontracting P.O.
to the vendor.
Is This Answer Correct ? | 6 Yes | 2 No |
Answer / sowmya
only one accounting document with six posting lines is
generated
Is This Answer Correct ? | 2 Yes | 2 No |
Answer / sathya
Only one acccounting document will generate that too with
reference of subcontracting P.O to the vendor
Is This Answer Correct ? | 1 Yes | 3 No |
Answer / mohan
Only one Accounting Doc will generate
but posting lines is depends upon components
Is This Answer Correct ? | 2 Yes | 10 No |
Hi all I am vijay working in SAP MM module as an End user for the last 5 yrs.I have done a private course for SAP MM Configuration.Whatz are all the possibilities that i can change my role as a functional consultant? The required qualification for a consultant is atlst 1 E2E Impl. Cycle. I am not sure dat how a fresher can get Impltn exp. with this kind of minimum criteria? Do you think people like me can get any real chances to survive in this field without showing any fake experience? Or do you think datz the trend currently going on without the knowledge of some fools like me? Ur valuable guidance on this please...
what is cbp? What is the difference between cbp and mrp?
Termsof payment are not maintained in Purchasing data of vendor master record but payment terms are maintained in the company code segment of vendor master record still payment term is not getting picked up from company code segment in the purchase order.
What are the data in the mm module that are maintained at the company code level?
How does the PO pick up the pricing schema?
Explain full cycle
In Hyderabad i want real time experience person on MM sap i want live exp from any one who is working in sap mm as consultant
2 Answers Bollineni Castings Steel,
What are ‘transaction keys’ while setting obyc?
What is material attribute? How you will differentiate Row material and Finish goods?
Can someone please share me the FSD for SAP MM related?? It would be great help and thanks in advance.
What is meant by a release strategy?
What is the basic data required to create po?