Can you explain about actual GI (gods issue) date and
planned GI date? Can actual GI date differ from planned GI date?
Answer / cv
Planned GI is calculated by the system, ie we have to do GI
on that date. But in real scenario it may not be the same,
in this case system picks up the system date as actual GI date.
It is possible that both are of different dates.
Is This Answer Correct ? | 8 Yes | 1 No |
In SAP SD can any one tell me ,, 1:- What is unit test and what is integration test??? 2:- In end user training is there any perticular steps have to follow,or any one tell me what are the steps..???
How to know that customer has paid the bill? OR what is the procedure to make payment against a bill?
what is t-code for listing the blocked documents?
I want customer's ordering quantity should be not less than 10 and delivery quantity not less than 4. So how can I configure this??
How can we configure that a bill is printed immediately and at the same time an email be send to the customer? Is it possible or not.
In SAP-SD, what is the Landscape of your project?Plz. help me.
explain about minimum value surcharge calculated?
In Retail business scenario, How can we do the PGI if material is not available? Mean customer ready to take the material but physically and in system material is not available ? Is it any way to do delivery?
How can you dynamically display only the lowest level of accounts ( level six) in a report? Please select one from the given choice below. a)Select a level six account and use the same selection level method b)Set the level to be displayed in the dimension builder account using characteristics c)Set the account filter by selecting the accounts individuals d)Select the account by hierarchy from level five to six
How can we assign one credit limit to two customers?
what is the sla in your current project? what is the billing rate? how to answer these questions? i explained about the ticketing levels p1,p2,p3,p4 but the interviewer was not satisfied with the answer what does he mean by sla in the project??
WHAT SHOULD YOU DO IF R/3 STANDARD PRICING DOES'NT MEET YOUR REQUIREMENT??