Explain what happens to planned after it has been converted into production order?
No Answer is Posted For this Question
Be the First to Post Answer
Difference between standard cost and variable cost.
Mention what are the t-codes for creating, changing and summarizing bom?
Why and how you calculate WIP?
what are the basics of PP ?
i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
What is Schedule Margin key. How floats works in scheduling?
What do we do in realization phase?
What is COIS?
Explain the gaps and the steps involved in them.
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
what is backflush? what are the benefits of back flush?
what are the problems you faced in MRP?